Carriage of the portal crane (weight 300 mts) in the non-dismantled condition by barge TMI-4. The crane was delivered from Mariupol to Cape Zhelezny Rog (Construction site Tolyaty Azot). Loading/discharging - using Ro-Ro method by Yuzhmormontazh. Towing was made by Donbasstransitservice tug boats “Shtil” and “Kapella”.
|
|
|
|
|
|
|
|